Laserfiche WebLink
Page 8 of 9 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />® Other (Specify) I hour visual leak test <br />Test Equipment Used: See attached testing procedures <br />Equipment Resolution: <br />Spill Box # 87-1 Fill Spill Box # 87-2 Fill <br />Spill Box # 91 Fill Spill Box # <br />Bucket Diameter & Brand: <br />12" 12" <br />12" <br />Bucket Depth: <br />12.5" 12.5" <br />12" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes 30 Minutes <br />30 Minutes 30 Minutes <br />Test Start Time: <br />9:10am 8:27am <br />8:27am <br />Initial Reading (RI): <br />1115/169' 1111/1699 <br />11 '/4" <br />Test End Time: <br />10:10am 9:27am <br />9:27am <br />Final Reading (RF): <br />1115/16" 11 11/16" <br />11 '/4" <br />Test Duration: <br />1 hour 1 hour <br />1 hour <br />Change in Reading (RF-Rj): <br />0 0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 0 <br />0 <br />TestResult: <br />0 Pass' ❑ Fail ® Pass,,',, El Fail <br />Z Pass ❑ Fail ❑ ' Pass ❑ ;Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />87-1 Fill Bucket — replaced bucket lower Wring <br />