My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test Method Developed By: <br />0 0 Page 3 of 6 <br />5. SECONDARY PIPE TESTING <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Liquid Filled Gauge 1% Dial Span Accuracy Equipment Resolution: 15 P.S.I. <br />NEEM, Piping Run diesel 2" line Piping Run diesel 3111ine <br />Piping Material: Fiberglass fiberglass <br />Piping Manufacturer: <br />ameron <br />ameron <br />Piping Diameter: <br />3" <br />4" <br />Length of Piping Run: <br />16' <br />10' <br />Product Stored: <br />diesel <br />diesel <br />Method and location of <br />i in -run isolation: <br />Isolation Test Boot / <br />Turbine Sump <br />Isolation Test Boot / <br />Turbine Sum <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />07:25 <br />9:30 <br />Initial Reading (R,): <br />5 P.S.I. <br />5 P.S.I. <br />Test End Time: <br />08:25 <br />10:30 <br />Final Reading (RF): <br />5 P.S.I. <br />5 P.S.I. <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 P.S.I. <br />0 P.S.I. <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fait <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.