My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_1998-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:51:51 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2008
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_1998-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution: .25 <br /> , <br /> NE11Piping Run# <br /> SUPPLY/RETURN Piping Run# Piping Run# Piping Run# <br /> SECONDARY#1171 <br /> Piping Material: POLY <br /> Piping Manufacturer: ENVIRO FLEX <br /> Piping Diameter: 3 INCH <br /> Length of Piping Run: APPROX. 100 FEET <br /> Product Stored: RED DIESEL <br /> Method and location of TEST BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN. <br /> starting test: <br /> Test Start Time: 9:20 AM <br /> Initial Reading(RI): 5 PSI <br /> Test End Time: 9:22 AM <br /> Final Reading(RF): 0 PSI <br /> Test Duration: 2 MIN. <br /> Change in Reading(RF-Rj): 5 PSI <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: ❑ Pass ®Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> SUPPLY AND RETURN SHARE A COMMON SECONDARY. SECONDARY PIPING FALIED AT THE TEST BOOT. <br /> REPLACEMENT OR REPAIR OF THE BOOT IS NEEDED <br />
The URL can be used to link to this page
Your browser does not support the video tag.