Laserfiche WebLink
9 <br /> Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: INCON TS-STS TEST UNIT Equipment Resolution: .0006 <br /> Sump#1171 Sump# Sump# Sump# <br /> Sump Diameter: 44 INCHES <br /> Sump Depth: 56 INCHES <br /> Sump Material: PLASTIC <br /> Height from Tank Top to Top of 20 INCHES <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 15 INCHES <br /> Electrical Penetration: <br /> Condition of sump prior to testing: GOOD <br /> 2 INCHES ABOVE <br /> Portion of Sump Tested' SUMPS HIGHEST <br /> PIPING <br /> PENERATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No ®NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 MIN. <br /> test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 <br /> Test Result: ❑ Pass ®Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ®No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified fimctional after testing? ❑Yes ®No ❑NA E]Yes ❑No ❑NA E]Yes ❑No E]NA El Yes El No El NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> PIPING SUMP FAILED DUE TO SECONDARY TEST BOOT. <br />