Laserfiche WebLink
SWRCB, January 2002 <br />0 0 Page _3_ of_8_ <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />® Pressure ❑ Vacuum <br />❑ Other (Spec) <br />❑ Hydrostatic <br />Test Equipment Used: 0 —15 PSI GAUGES <br />Equipment Resolution: + / - 0.002" <br />ing Run # 87 <br />IN <br />Piping Run # 87 <br />SYPHON <br />Piping Run # 91 <br />Piping Run # <br />Piping Material: <br />TA.O. <br />ERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />A.O. SMITH <br />A.O. SMITH <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />100' <br />12' <br />100' <br />Product Stored: <br />87 <br />87 <br />91 <br />Method and location of <br />piping-run isolation: <br />TEST BOOT / <br />STP SUMP <br />TEST BOOT / <br />PIPING SUMP <br />TEST BOOT / <br />STP SUMP <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 MIN <br />15 MIN <br />15 MIN <br />Test Start Time: <br />12:30 PM <br />12:30 PM <br />12:30 PM <br />Initial Reading (Rj): <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test End Time: <br />1:30 PM <br />1:30 PM <br />1:30 PM <br />Final Reading (RF): <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test Duration: <br />1 HR <br />IHR <br />IHR <br />Change in Reading (RF-RI): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />Test Result; <br />0 Pass ❑ Fail <br />® Pass ❑ <br />Fail <br />Pass 0 Fail <br />❑ Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />