My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:06:52 PM
Creation date
6/23/2020 6:53:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page _5_ of —8- <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: INCON SUMP <br />TESTER <br />Equipment Resolution: + / - 0.002" <br />UDC # 1/2 <br />UDC # 3/4 <br />UDC # 5/6 <br />UDC # 7/8 <br />UDC Manufacturer: <br />TOTAL CONT <br />TOTAL CONT <br />TOTAL CONT <br />TOTAL CONT <br />UDC Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />UDC Depth: <br />32" <br />32" <br />32" <br />32" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />10" <br />10" <br />10" <br />10" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />8" <br />8" <br />8" <br />8" <br />Condition of UDC prior to <br />testing: <br />FAIR <br />FAIR <br />FAIR <br />FAIR <br />Portion of UDC Tested <br />2" ABOVE <br />PENETRATION <br />2" ABOVE <br />PENETRATION <br />2" ABOVE <br />PENETRATION <br />2" ABOVE <br />PENETRATION <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?` <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?` <br />[:]Yes❑ No ®NA <br />❑Yes ❑ No ®NA <br />El Yes E]No ®NA <br />[]Yes❑ No ®NA <br />Was fail-safe verified to be <br />o erational?` <br />❑ yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />❑Yes [:]No ®NA <br />[]Yes❑ No ®NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />Test Start Time: <br />11:34 AM <br />11:50 AM <br />11:34 AM <br />11:34 AM <br />Initial Reading (RI): <br />6.9180" <br />3.7827' <br />7.1939" <br />6.0481 " <br />Test End Time: <br />11:49 AM <br />12:05 PM <br />11:49 AM <br />11:49 AM <br />Final Reading (RF): <br />6.9179" <br />3.7826" <br />7.1938" <br />6.0470" <br />Test Duration: <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />Change in Reading (RF -RI): <br />-0.00011, <br />-0.0001" <br />-0.00011, <br />-0.0011" <br />Pass/Fail Threshold or Criteria: <br />+ /-,- 0.002" <br />+ / - 0.002" <br />+ / - 0.002" <br />+/-0.002" <br />Test 12esult:.. <br />M Pass (] Fail <br />0 Pass ❑ Fail <br />0 Pass ❑ Fail <br />0 Pass ❑ Fail <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />®Yes [:]No ❑NA <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑ No ❑ NA <br />®Yes [:]No ❑ NA <br />®Yes ❑ No ❑ NA <br />®Yes ❑ No [:INA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br />SENSOR FUNCTIONALITY WAS NOT CONFIRMED. THIS PROCEDURE IS NOT A PART OF SB989 TESTING. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.