My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:52:27 PM
Creation date
6/23/2020 6:54:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File MH28727 V01.0 Sec. 11 ILL—1A(PageO)Issued: 2004-01-05 <br /> And Report <br /> ILM <br /> STEP I Identify the damaged boat and wha the prop"liguefine Repair <br /> Boni based upon dw number of skids and the pipe OD.(See 200b <br /> Catalog,Section 10 and Appendix 1) <br /> Lim, I <br /> %I'1:1)2 Remove band damps fircen old fitting.Rentoir the nuts Meom the <br /> stube and store for future use.Remove old fittingMw old filling <br /> will need to be cut off.Take care not up damage the Secondary jj <br /> pipe. @ <br /> C <br /> .%rf EP 3 Install all PtHedume split compontfth onto the Pipe C=VJWIY.,%B <br /> Pellethane pieces must be rebonded back*Wohcr with Blue Sea) <br /> Glut.This is done by ensurtag that the surf am are dwin and dry. <br /> Apply a liberal bond of Blue Sea] mW hold the aram a" <br /> securely un ll It is hued.We helpful to uw the clumps to 1 <br /> hold the boot closed during curing. Molded connections should <br /> Meld themselves closed within five minutes if there are no stresses <br /> on them.'Che Blue Seal glue will he fully cured In 40 minulm <br /> M, <br /> T! <br /> EP4 Once all components are bonded,apply a liberal bead of dOW <br /> 'Bosilk JIDOFS to the untleeside of the seal. <br /> This willwadi. In <br /> i make the al with the sump wasert poly ring into s- <br /> the gasket and position It onto the skids and up against the munp <br /> w2IL C.-- <br /> .SlrEP 5 Reinstan nub and tighten them in a star pattem. <br /> !dei a <br /> 0060438298 <br />
The URL can be used to link to this page
Your browser does not support the video tag.