Laserfiche WebLink
JUN-20-2011 07:43 Service Station Systems 408 938 8888 P.09 <br /> 0 Is <br /> 4. UNDER-DISPENSER CONTAINMENT DC TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ® industry Standard p Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used. ❑Pressure ❑ Vacuum N Hydrostatic <br /> Q other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/_0.002" <br /> UDC 41/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: OPW OPW OPW OPW <br /> UDC Material: Plastic Plastic Plastic Plastic <br /> UDC 31" 3109 3111 31" <br /> Height from UDC Bottom to Top 16„ 16„ 16„ 16" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 81, 811 Bit s„ <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good Good Good <br /> testing: <br /> Portion of UDC Tested 2"above piping 2"above 2lplN 2"above i in 2"above EiRing <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes M No 0 NA ❑Yes❑No ®NA p Yes❑No ®NA p Yes❑No ONA <br /> raduct and water)?* <br /> Turbine shutdown res nse time N/A N/A N/A NIA <br /> is system programmed for fail- ❑Yes❑No ®NA p Yes Cl No ®NA [3 Yes Q No IRNA ❑Yes[3 No ®NA <br /> safe shutdown?" <br /> Was fail-safe verified to be ®Yes p No ®NA ❑Yes p No ®NA ❑ Yes❑No ®NA ❑Yes❑No ®NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 1:05 pm 2:37 prn 11:22 am 1:05 m <br /> Initial Reading(R,): 4.8392 4.2472 4.7040 3.2838 <br /> Test End Time: 1:20 pm 2:52 prn 11:37 am 1:20 <br /> pm <br /> Final Reading(RF): 4.8395 4.2478 4.7057 3.2856 <br /> Test Duration: 15 min. 15 min. 15 min. 15 thin. <br /> Chane in Reading(RF-R,): +0.0003 +0.0006 x-0.0017 +0.0018 <br /> Pass/Fail Threshold or Criteria: +/-0,002" +/0.002" +/-0.002" +/-0.002" <br /> Test Result: ® Pass 0 Fail ® Pass 0 Fail M Pass 0 Fail W Pass 0 Fail <br /> Was sensor removed for testin . M Yes❑No O NA M Yes❑No❑NA ®Yes G3 No❑NA N Yes 0 No❑NA <br /> Was sensor properly replaced and 0 Yes❑No❑NA ®Yes C3 No Q NA ®Yes❑No❑NA ®Yes 0 No Cj NA <br /> verified functional after testin ? <br /> Comments—(include in ormation on repairs made prior to lestin , and recommended ollow-u orfaded tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> ' if the entire depth of the UDC is not tested,specify how much was tested. If the answer to#=of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />