Laserfiche WebLink
SWRCB. January 2002 Page 3 of 7 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: [ ] Piping Manufacturer [ X ] Industry Standard [ ] Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: [ X ] Pressure [ ] Vacuum [ ] Hydrostatic <br />[ ] Other (Specify) <br />Test Equipment Used: Equipment Resolution: <br />PipingRun #1 Piping stunnriping ft _ ■ •_• <br />Material• <br />FIBERGLASS <br />iiiin <br />ing Manufacturer: <br />SMITH <br />Piping Diameter: <br />3 INCH <br />Length of Piping Run: <br />95 FEET <br />Product Stored: <br />UNLEAD <br />Method and location of <br />piping -run isolation: <br />BOOT IN SUMP <br />Wait time between applying <br />pressure/vacuum/water and <br />10 MINUTES <br />starting test: <br />Test Start Time: <br />9:00 AM <br />Initial Reading (Rl) <br />4 LBS. <br />Test End Time: <br />10:00 AM <br />Final Reading (Rf): <br />4 LBS. <br />Test Duration: <br />1 HOUR <br />Change in Reading (Rf-RI) <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />NO DROP <br />IXI Pass Fail_ Pass L Fail Pass Fail Pass Fail' <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />