My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 SECTION 11.2 FUEL PUNM AND DISPENSER INSTALLATION <br />Strainer shall be of 100 mesh rustproof screen with a 35 micron Filter. <br />J. Provide structural steel stands for mounting of pumps and control oaneis. Provide factory <br />wiring and factory piping for pumps and accessories. <br />K. Provide all controls for motor starters, disconnects, and terminal block for connection to <br />auxiliary tank level controls. <br />L. Self-contained dispensers and pumps shall be listed by Underwriters Laboratories. Inc. <br />?.02 PRESSURE-TYPE DISPENSERS AND SUBMERSIBLE PUMPS <br />.k. The Contractor shall install the equipment as described on the service station equipment list. <br />The scope of work will designate if the equipment is to be owner furnished or contractor <br />furnished. <br />B. Base and frame of dispenser shall be rectangular -shaped steel stamping xith a bolted -down <br />design and a weather protection, anti -corrosion finish. <br />C. A product hose of 12 feet in length having a 1 -inch inside diameter constructed of gasoline <br />resistant anti -static synthetic rubber with a retractor shall be installed. For gasoline delivery <br />systems, the hose will be coaxial capable of vapor recovery in compliance with the CARB. <br />D. Fuel nozzle shall be an automatic shut-off, i -inch rigid tube, curved and tapered in <br />compliance with CARB regulations. <br />E. Submersible pumps shall be of the appropriate horsepower to ensure adequate flow rates. <br />F. Pump switch shall be designed so motor is activated only when operating handle is turned to <br />the ON position. A remote shut-off switch shall be provided that is in compliance with all <br />applicable federal, state, and local codes. The remote shut off switch is to be a minimum of 15' <br />and a maximum of 75' from the nearest pump or dispenser. <br />G. Register shall be same as for suction systems. <br />PART 3 - EXECUTION <br />3.01 INSTALLATION PREPARATION <br />A. Prior to installing mechanical equipment, the Contractor shall check equipment arrangement <br />• and dimensions with the manufacturer's and the Engineer. <br />709s1123 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.