My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REDJACKET. CPT Controller Manual <br /> Running and Attaching the Dispenser Input <br /> Refer to figure 3.4 for steps 1 and 2. <br /> PRESSURE <br /> TRANSDUCER <br /> DISPENSER <br /> INPUT <br /> RELAY DRY <br /> CONTACT <br /> OUTPUT CONNECTORS <br /> GROUND <br /> U (M1) <br /> V (M2) <br /> W (M3) <br /> Y� <br /> FIGURE 3.4 W/RwG DISPENSER INPUT AND ATTACHING oUTPUT POWER <br /> Step 1: Attach the 115V power wire from the dispense-enable input <br /> to the '+' location on the dispenser input connector. <br /> Step 2: Attach the neutral wire (if used) from the dispense-enable <br /> input to the '—' location on the dispenser input connector. <br /> Running and Attaching the Output Power <br /> Refer to figure 3.4 for steps 1-3. <br /> Step 1: Pull four 14-gauge, THHN gasoline-, oil-, and water- <br /> resistant wires from the CPT Controller to the contractor's box <br /> located on the side of the CPT pump. <br /> Notice/ Red Jacket recommends the use of one green,one <br /> yellow, one red,and one black wire. <br /> Notice/ Pull the shielded cable at the same time as the pump <br /> wires. <br /> Chapter 3: Installation 3-8 ARE260-240 Rev.A ♦ 6197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.