Laserfiche WebLink
REDJACKET. CPT Controller Manual <br /> Running and Attaching the Dispenser Input <br /> Refer to figure 3.4 for steps 1 and 2. <br /> PRESSURE <br /> TRANSDUCER <br /> DISPENSER <br /> INPUT <br /> RELAY DRY <br /> CONTACT <br /> OUTPUT CONNECTORS <br /> GROUND <br /> U (M1) <br /> V (M2) <br /> W (M3) <br /> Y� <br /> FIGURE 3.4 W/RwG DISPENSER INPUT AND ATTACHING oUTPUT POWER <br /> Step 1: Attach the 115V power wire from the dispense-enable input <br /> to the '+' location on the dispenser input connector. <br /> Step 2: Attach the neutral wire (if used) from the dispense-enable <br /> input to the '—' location on the dispenser input connector. <br /> Running and Attaching the Output Power <br /> Refer to figure 3.4 for steps 1-3. <br /> Step 1: Pull four 14-gauge, THHN gasoline-, oil-, and water- <br /> resistant wires from the CPT Controller to the contractor's box <br /> located on the side of the CPT pump. <br /> Notice/ Red Jacket recommends the use of one green,one <br /> yellow, one red,and one black wire. <br /> Notice/ Pull the shielded cable at the same time as the pump <br /> wires. <br /> Chapter 3: Installation 3-8 ARE260-240 Rev.A ♦ 6197 <br />