My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CPT Controller Manual REDJACKET <br /> Step 2: Attach the green groundwi to the top location of the <br /> output power connector marked: <br /> The installer must attach this ground wire. Failure to <br /> attach any ground lead may result in severe personal <br /> injury,death,or substantial property damage, if <br /> ignored. <br /> Step 3: Make the following connections on the output power <br /> connector: <br /> 0 M1 to M1 (U) <br /> 0 M2 to M2 (V) <br /> 0 M3 to M3 (W) <br /> It is possible to wire the pump so that it runs in <br /> Notice/ reverse,which triggers an alarm. If this alarm occurs, <br /> the red light on the CPT Controller will flash once. To <br /> correct this problem,switch any two motor wires and <br /> check for proper rotation. <br /> Wiring the Contractor's Box <br /> Step 1: Remove the cover of the pump contractor's box. <br /> O � <br /> PRESSURE <br /> CONTRACTOR'S ` o s ® TRANSDUCER <br /> BOX <br /> 0 a c <br /> COVER <br /> INTRINSIC <br /> SAFETY <br /> BARRIER � O <br /> O <br /> ADJUSTABLE <br /> FUNCTIONAL <br /> ELEMENT <br /> FIGURE 3.5 Top VIEW OF PACKER <br /> Step 2: Pull the wires from the packer out of the contractor's box. <br /> ARE260-240 Rev.A ♦ 6/97 3-9 Chapter 3: Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.