Laserfiche WebLink
CPT Controller Manual REDJACKET <br /> Step 2: Attach the green groundwi to the top location of the <br /> output power connector marked: <br /> The installer must attach this ground wire. Failure to <br /> attach any ground lead may result in severe personal <br /> injury,death,or substantial property damage, if <br /> ignored. <br /> Step 3: Make the following connections on the output power <br /> connector: <br /> 0 M1 to M1 (U) <br /> 0 M2 to M2 (V) <br /> 0 M3 to M3 (W) <br /> It is possible to wire the pump so that it runs in <br /> Notice/ reverse,which triggers an alarm. If this alarm occurs, <br /> the red light on the CPT Controller will flash once. To <br /> correct this problem,switch any two motor wires and <br /> check for proper rotation. <br /> Wiring the Contractor's Box <br /> Step 1: Remove the cover of the pump contractor's box. <br /> O � <br /> PRESSURE <br /> CONTRACTOR'S ` o s ® TRANSDUCER <br /> BOX <br /> 0 a c <br /> COVER <br /> INTRINSIC <br /> SAFETY <br /> BARRIER � O <br /> O <br /> ADJUSTABLE <br /> FUNCTIONAL <br /> ELEMENT <br /> FIGURE 3.5 Top VIEW OF PACKER <br /> Step 2: Pull the wires from the packer out of the contractor's box. <br /> ARE260-240 Rev.A ♦ 6/97 3-9 Chapter 3: Installation <br />