Laserfiche WebLink
REDJACKETA CPT Controller Manual <br /> Step 3: Cut the wires, leaving about 6 inches hanging out of the <br /> contractor's box (see figure 3.6). a <br /> 5s <br /> a w <br /> d <br /> �r <br /> z <br /> FIGURE 3.6 WIRING THE CONTRACTOR'S BOX <br /> Step 4: Connect the electrical conduit with approved fittings and <br /> seal-offs to the pump contractor's box. <br /> Step 5: Attach the wires from the CPT Controller to the wires in the ' <br /> contractor's box. Match the color coding: <br /> 0 yellow wire to yellow wire, <br /> 0 black wire to black wire, and <br /> 0 red wire to red wire. <br /> Step 6: Connect the green ground wire to the terminal marked <br /> "GND" inside the contractor's box. <br /> The installer must attach this ground wire. Failure to <br /> attach any ground lead may result in severe personal <br /> injury, death,or substantial property damage, if <br /> ignored. <br /> Notice/ Resistance between submersible ground and earth <br /> ground must be less than 1 ohm(Q). <br /> Notice/ If the pressure transducer and threaded intrinsic safety <br /> barrier are used at the pump, refer to "Installing the <br /> Intrinsic Safety Barrier and Pressure Transducer," <br /> before proceeding. <br /> I <br /> Chapter 3:Installation 3-10 ARE260-240 Rev.A ♦ 6/97 <br />