My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CPT Controller Manual <br /> REDJACKET <br /> Step 5: When the pressure is correct, replace the brass cap until it <br /> touches the functional element body. <br /> Notice If a siphon system is used,the operating pressure of <br /> the pump must be 2 psi greater than the setting for the <br /> functional element. <br /> Calibrating the Flow Rate <br /> To calibrate the flow rate, it is necessary to determine the volume of <br /> fuel that is pumped during a set time interval. <br /> Tools: You will need the following: <br /> 0 a stop watch, and <br /> 0 a 5-gal (or larger) container approved for flammable <br /> liquids. <br /> Use care not to overflow the container while <br /> Caution dispensing. <br /> Notice/ Be sure all air has been cleared from the lines. <br /> co— Red Jacket suggests starting with a pressure setting of 30 psi. <br /> This will need to be adjusted to meet your site requirements. <br /> Step 1: With the nozzle closest to the pump fully open, and <br /> dispensing into an approved 5-gal container or the gas tank of an <br /> automobile, pump fuel for a timed interval of 15 seconds, using a <br /> stopwatch. <br /> Give the dispenser a "running start"to make sure it is flowing <br /> normally before starting the stopwatch. Note the volume pumped <br /> during the "running start." <br /> ARE260-240 Rev.A ♦ 6197 4-5 Chapter 4: Operation <br />
The URL can be used to link to this page
Your browser does not support the video tag.