Laserfiche WebLink
t ' <br /> 3 <br /> $WRCB January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> Other(Sped) <br /> Test Method Used: ure 0 Vacuum 0 Hydrostatic <br /> 0 Oder(Sped) <br /> Test Equipment Used Q(. SS tt vQ G u u 5 P 5 t4y,0jC Equipment Resolution: / ® j 3 P <br /> Piping Run#j— hping Run# ?- Piping Run# ping Run# <br /> Piping Material: F c" 1 G s s t*ss V (o a <br /> Piping Manufacturer. <br /> Piping Diameter: 3 . if t► <br /> Length of Piping Run: Ytb k, ao ve Y. 2t-S AD D Y,,V)e d 2-7-0 <br /> Product Stored: u Icc 3 a sl u la a 7 i o le1 <br /> Method and location of �} o®-�-cc-� -f� d�a s u� e T4s-V- bo o 4---ct-t- <br /> i in -run isolation: S l"j, [V7rK4 $wm a*1 r <br /> Wal a between applying <br /> ss uum/water and <br /> startm test: l L�o u✓ G Gt vu I/ L vt,` <br /> Test start Time: 10 : 00 !0 . v.' c7 <br /> Initial Reading(Rt): a$ ps T 57 PS 5 <br /> Test End Time: It, o 0 <br /> Final Reading(RF): 15 PS J S Ir <br /> Test Duration: l t o"� l �C��- " <br /> Change in Reading(RF-Rj: /�S' !��' S <br /> :r <br /> Pass/Fail Threshold or <br /> Criteria: majgjeclable toss od d- �1 �-,1,, e $oss n>o e-tee ,le fvs5 <br /> Test Result: 1 &Pass ❑Fail Pass ❑Fail Pass 0 Fail 0 Pass 0 Fai <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />