Laserfiche WebLink
6 <br /> SWRCB,January 2002 Page q of <br /> 6. PIPING SLTW TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard ^ofessional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: C2 t d w a l/ t c. Equipment Resolution: t 0d- <br /> Sump# L Sump# 2 Sump# 3 ump# <br /> Sump Diameter: <br /> Sump Depth: �ap112 ar `70 ►° (O �► LJ? <br /> Sump Material: F, 12CV-1 14 s 5 F 1 <br /> Height from Tank Top to Top of v' t , v—A 6, kv 5 / <br /> Hi est Piping Penetration: �w���vy ( +o ��U �r <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 410 <br /> Condition of sump prior to testing: _?(110✓ �/ <br /> Portion of Sump Tested' t o W-z -L,eVCL Lt 3 t 2�' cv 5 ►' <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothYes ❑No DNA gVesONoONA es 11No 0 NA 0 Yes 0 0 NA <br /> product and water)?* <br /> Turbine shutdown response time $cc ,. 3 S•u - 3 Se-c <br /> shutdown?Is system <br /> programmed for fail-safe es 0 No 0 NA Yes 0 No 0 NA es ❑No 0 NA 0 Yes o DNA <br /> Was fail-safe verified to be 0 Yes �No 0 NA ❑Yes o 0 <br /> al?° NA 0 Yes , l0 0 NA ❑Yes iNo ❑NA <br /> o ratian <br /> Wait time betw;; tarting <br /> lying <br /> pressure/vacuu <br /> test: G m r<r 4"-r_S ®rfda ! ra rwwj <br /> Test Stan Time: <br /> Initial Reading(Rj): (e F f,s-f--en e F",s 4 C-rve(e <br /> Test End Time: I? : /S- kb; f S- <br /> Final Reading(RF): 7L Gn-z� EW,,LL 6? /ter✓0- Gf�.c- <br /> Test Duration: d J>r 5 36 M rk,A-�_s 3®"r-c, s <br /> Change in Reading(RF-RI): too G(,_ Nd G� a d <br /> Pass/Fail Threshold or Criteria: ,o o 30 r"ram r-4 <br /> Test Result: Pass 0 Fail XPass ❑Fail RPass 0 Fail Pass 0 F '1 <br /> Was sensor removed for testing? es 0 No 0 NA es 0 No 0 NA UYes 0 No 0 NA 0 es ❑No 0 A <br /> Was sensor properly replaced and <br /> verified functional after testin ? Xy_es 0 No 0 NA kYes 0 No ❑NA es ❑No ❑NA /Yes ❑No 0N[\ <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />