Laserfiche WebLink
SWRCB,January 2002 Page 5 of <br /> 7. UNDER-DISPENSER CONT NT qMQ TESTING <br /> Test Method Developed By: 0 UDC Manufacturer 0 industry Standard ofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 0 Pressure ❑Vacuum ^ydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used:C4 l 1 epi Equipment Resolution: ®6&7- <br /> g' <br /> UDC# a- �,-L UDC# -3 z-1 UDC# S UDC# e <br /> UDC Manufacturer: e j -cm W e-s -eve V^_ uJ r g- <br /> UDC Material: F�hw (. s s P l L4 s S I",*r <-C's <br /> UDC Depth; 11-5-VA:` <br /> Height from UDC Bottom to Top <br /> of Hi est Piping Penetration: O` /off <br /> ` <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to (�Y- o,,y e'y <br /> testing: / <br /> Portion of UDC Tested Wce e-✓ G12J` W e4 r r/ f l e r wdr4-e4,­Auw4,1z1% W ,r .4//#t <br /> Does turbine shut down when <br /> UDC sensor detects liquid(bothYes 0 No 0 NA es 0 No 0 NA Yes 0 No 0 NA VYes 0 No ❑NA <br /> product and water)?* '\\ <br /> Turbine shutdown response time s?t , v . <br /> Is system programmed for fail- �es ❑No ❑NA es ❑No ❑NA fes ❑No ❑NA es ❑No ❑NA <br /> safe shutdown? Y\ <br /> es <br /> fail-safe verified to be <br /> o onal?' 0 Yes o ❑NA 0 Yes 0 0 NA 0 Yes ( to DNA 0 Yes 8So DNA <br /> erati <br /> Wait time betwepHnnkilying <br /> pressure/vacu ter d <br /> starting test l o t--T-u 4--- Gd r-t VL V --:5 6 r-,,n.-t.4S <br /> Test Start Time: 2: 2 0 f o _ //11 D <br /> Initial Reading res f C**� 4- G <br /> Test End Time: 17' s-0 .2 =/D2-= / <br /> Final Reading )G47� e+ e,6f ��''� Gn G"�Q l=►'►�'�" <br /> Test Duration: i <br /> Chane in Reading(R,, Nu /'VC- <br /> Pass/Fail Threshold or Criteria: ,o a y 3 ,o o r ,3®r..Y ,-6.6 o d d <br /> Test Result: Wpass 11 Fail ass 0 Fail Pass 0 Fail ass ❑Fail <br /> Was sensor removed for testing? es 0 No 0 NA es ❑No 0 NA >tes 0 No ❑NA es 0 No 0 NA <br /> Was sensor properly replaced and yes 0 No 0 NA es 0 No 0 NA es 0 No ❑NA es ❑No ❑NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing: and recommended follow-up for failed tests) <br /> r If the entire depth of the UDC is not tested,specify how much was tested. If the answer to my of the.questions indicated with an <br /> asterisk(*)is"NO"or"ATA",the entire UDC must be tested. (See SWRCB LG-160) <br />