Laserfiche WebLink
SWRCB, January 2002 Page 4 of 7 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:Incon TS -STS <br />Equipment Resolution:+/- 0.0001" <br />Sump #T-1/STP <br />Sump Diameter: 47" <br />Sump #T-2/STP <br />47" <br />Sump #T-3/STP <br />47" <br />Sump #T-4/STP <br />47" <br />Sump Depth: 60" <br />60" <br />60" <br />60" <br />Sump Material: FRP <br />FRP <br />FRP <br />FRP <br />Height from Tank Top to Top of 26" <br />Highest Piping Penetration: <br />26" <br />26" <br />13" <br />Height from Tank Top to Lowest 18" <br />Electrical Penetration: <br />18" <br />18" <br />18" <br />Condition of sump prior to testing: OK <br />OK <br />OK <br />OK <br />Portion of Sump Tested' 2" above highest pipe pen <br />2" above highest pipe pen <br />2" above highest pipe pen <br />2" above highest pipe pen <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑Yes ❑No ® NA <br />product and water)?* <br />❑Yes ❑No ® NA <br />❑Yes ❑No® NA <br />❑Yes ❑No ® NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />❑ <br />shutdown?* Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes [-]No ®NA <br />❑Yes ❑No ®NA <br />Was fail-safe verified to be <br />o erational?' ❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes [-]No ®NA <br />Wait time between applying <br />pressure/vacuum/water and starting 15 Minutes <br />test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: 12:18 <br />12:38 <br />11:39 11:57 <br />11:03 11:20 <br />Initial Reading (Ri): 4.0051 <br />4.0051 <br />4.9567 4.9563 <br />5.1817 5.1811 <br />Test End Time: 12:33 <br />12:53 <br />11:54 12:12 <br />11:18 11:35 <br />Final Reading (RF): 4.0050 <br />1 4.0063 <br />4.9563 1 4.9568 <br />5.1810 1 5.1809 <br />Test Duration: 15 Min Each(30)min <br />15 Min Each(30)min <br />15 Min Each(30)min <br />15 Min Each(30)min <br />Change in Reading (RF -RI): 0.0001 0.0012 <br />0.0004 1 0.0005 <br />0.0007 1 0.0002 <br />Pass/Fail Threshold or Criteria: +/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />Test Result: ® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ® Fail <br />® Pass ❑ Fail <br />Was sensor removed for testing? ®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />Was sensor properly replaced and ®yes ❑No [:INA <br />verified functional after testin ? <br />®Yes ❑No ❑NA <br />®Yes [:]No ®NA <br />®Yes ❑No ❑NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Tank #3 Turbine sump failed hydrostatic test damaged 4"test boot. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />