Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> I CFR Part 265.50 <br /> §265.50 -56 BRIEF DESCRIPTION 7TIAON IN <br /> PLAN <br /> §265.52 -14 <br /> - <br /> (e) The plan must include a list of all emergency equipment at the App. A- <br /> facility (such as fire extinguishing systems, spill control Response <br /> equipment, communications and alarm systems (internal and Equipment/ <br /> external), and decontamination equipment), where this Resources <br /> equipment is required. This list must be kept up to date. In <br /> addition, the plan must include the location and a physical <br /> description of each item on the list, and a brief outline of its <br /> capabilities. <br /> (f) The plan must include an evacuation plan for facility personnel §App. D - <br /> where there is a possibility that evacuation could be necessary. Evacuation Plan <br /> This plan must describe signal(s)to be used to begin <br /> evacuation, evacuation routes, and alternate evacuation routes <br /> (in cases where the primary routes could be blocked by <br /> releases of hazardous waste or fires). <br /> A copy of the contingency plan and all revisions to the plan must <br /> be: <br /> (a) Maintained at the facility, and Foreword - <br /> Distribution List <br /> and <br /> § 1.3 - Plan <br /> Distribution <br /> Procedures <br /> (b) Submitted to all local police departments, fire departments, Foreword - <br /> hospitals, and State and local emergency response teams that Distribution List <br /> may be called upon to provide emergency services. and <br /> § 1.3 - Plan <br /> Distribution <br /> Procedures <br /> §265.54-Amendment of contingency plan <br /> The contingency plan must be reviewed, and immediately <br /> amended, if necessary, whenever: <br /> (a) Applicable regulations are revised; § 1.4 - Plan <br /> Review and <br /> Update <br /> Procedures <br /> (b) The plan fails in an emergency; § 1.4 - Plan <br /> Review and <br /> Update <br /> Procedures <br /> Shell Supply and Distribution Cross Ref-7 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />