My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2200 - Hazardous Waste Program
>
PR0516115
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:19:03 AM
Creation date
6/26/2020 2:34:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0516115
PE
2226
FACILITY_ID
FA0012466
FACILITY_NAME
PREMIER FINISHING
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7910 S LONGE
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
588
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PF Job Description—Tank fine Operator <br /> IV. Knowledge and skill requirements { <br /> 1. Basic reading,writing, and arithmetic skills required in order to successfully complete all <br /> essential duties required. <br /> 2. Must be able to operate a pallet jack to pull parts from one location to another. <br /> 3. Must be able to operate tank lines without having direct supervision by the Plant Foreman. <br /> 4. Must be able to follow procedures per tank. <br /> 5. Ability to handle parts in a careful and consistent manner. <br /> V. Working Conditions <br /> 1. It is mandatory to wear all safety materials while operating in this department. It is very critical <br /> that all safety equipments be obtained by the Plant Foreman and worn at all times. <br /> 2. Frequent moving of the arms and hands in a consistent motion. <br /> 3. Majority of duties are performed in the ChemFilm department. <br /> VI. Acknowledgement <br /> I have read and understood Premier Finishing's job description for this position and promise to support <br /> and meet all the requirements expected from me in my daily work. <br /> EMPLOYEE SIGNATURE DATE <br /> LEAD DATE <br /> SUPERVISOR DATE <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.