My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2200 - Hazardous Waste Program
>
PR0516115
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:19:03 AM
Creation date
6/26/2020 2:34:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0516115
PE
2226
FACILITY_ID
FA0012466
FACILITY_NAME
PREMIER FINISHING
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7910 S LONGE
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
588
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 7910 S.Longe Street,Stockton CA 95206 <br /> Phone:(209)982-5585 Fax:(209)983-4050 <br /> wymprremierfinishing.com I <br /> 1(P IPrtmkr Catlnga <br /> PINI <br /> Job Description <br /> Job Title: Paint Mixer/Controller <br /> Department: Production <br /> Reports to: Gustavo Lopez <br /> i <br /> 1 <br /> - 1 <br /> Summary: <br /> This position is responsible to the Shop Foreman for Paint Mixing to supply Premier's painters with the product <br /> they need for each subsequent production job. There are numerous internal requirements needed to fulfill this task... <br /> they are listed below. <br /> 1.0 PURPOSE: Performs a number of tasks including mixing, cleaning, and maintaining liquid paint <br /> both in the paint mixing room and paint trailer. Reviews the daily list of production job guides and <br /> has paint ready for the painters when the job is ready for paint and or primer. <br /> 2.0 GENERAL RESPONSIBILITIES: <br /> 2.1 Paint Mixing <br /> 2.1.1 Paint mixer needs to be in accordance with procedure PFP 3 8-5.1 entitled Liquid Paint <br /> Mixing, Section 4.1 <br /> 2.1.2 Paint mixer does not need to be trained in paint application and inspection of painted <br /> articles like explained in PFP_3 8-5.1. <br /> 2.2 Performs daily housekeeping duties <br /> 2.2.1 Drum funnel to be closed at all times <br /> 2.2.2 All chemical gallons and quarts are to have their tops on and sealed tight <br /> 2.2.3 Labels are to be facing outward so they can be seen. <br /> 2.2.4 All drums,bins and buckets are to have labels with what it contains <br /> 2.2.5 No more than(5) 5gal of open paint buckets are allowed in paint mixing room <br /> 2.2.6 All empty drums,bins and buckets are to have empty labels put on them,immediately <br /> following it being empty. <br /> 2.2.7 All soiled towels are to be thrown away in red supplied cans with lids. <br /> 2.2.8 All garbage can are to have lids on at all times <br /> 2.2.9 The area inside and outside are to have excellent house-keeping. This includes the outside; <br /> left of paint mixing room&right of mixing room. <br /> 2.2.10 Always input paint usage and fill out paint logs if applicable. <br /> 2.2.11 Unused paint&powder are to be replaced/returned to paint trailers. ' <br /> 2.2.12 Remove all labels off drums buckets and bins when empty. <br /> 2.2.13 All paints containers are to be organized neatly. <br /> 2.2.14 All containers are to be put back into trailer storages where they were removed from. <br /> 3.0 There should be(two)5alg lon paint buckets located in the paint mixing room to store Solvent Based Paints and Water- <br /> Based Paint. <br /> 4.0 When mixing paint in the poly bags provided,bags need to be turned rnside out&ends cut,the ung left over parr <br /> needs to be collected in the 5 gallon bucket located and stored in the mixing room;one for Solvent Based and one for <br /> Water Based paint. ' <br /> 5.0 The poly bags need to be turned inside out&ends cut and allowed to dry before throwing into the garbage receptacle. <br /> P:\PF Training\PF job descriptions\Job Desciptions\Job Description- Paint Mixer <br /> 1.0.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.