Laserfiche WebLink
r � <br /> j <br /> f Kennedy/Jenks Consultants <br /> ri <br /> Specific objectives of this Work Plan are therefore to: <br /> • Characterize the crop uptake and assimilative capacity of the Woodbridge land application <br /> area for fixed dissolved solids (FDS) and nitrogen. <br /> • Develop management practices to improve constituent assimilation by crops, soil processes, <br /> and vadose zone processes and minimize percolation. <br /> • Provide preliminary polished water quality specifications to inform the Phase 3 winery <br /> process water treatment design. <br /> � r <br /> i ; <br /> ti <br /> Crop Uptake and Assimilative Capacity Work Plan, Page 2 <br /> Woodbridge Winery, Acampo, California <br />