My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
4500 - Medical Waste Program
>
PR0450116
>
COMPLIANCE INFO_2006-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2022 12:04:18 PM
Creation date
7/3/2020 10:16:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4500 - Medical Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2019
RECORD_ID
PR0450116
PE
4520
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\MW\MW_4520_PR0450116_7373 WEST_2015-2020.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />KAISERe -Central Valley Area <br />use of these kits for small spill clean up. The department will be <br />responsible for purchasing and restocking of supplies. <br />3.2.6. Don personal protective equipment required according to the type of <br />spill. At a minimum, the following should be used: <br />• Nitrile gloves (2 pair — user must always be double gloved). <br />• Chemical resistant gloves (To be worn over double set of nitrile <br />gloves). <br />• Impermeable suits <br />• Safety goggles <br />• Face shield <br />• Surgical mask <br />• Shoe covers <br />3.2.7. Dispose of all spilled clean-up materials/waste according to Hazardous <br />Materials and Waste Management, EC.HZ.039. <br />3.2.8. The EVS Supervisor, Manager or designee will complete the <br />Spill/Splash/ Release Reporting Form EC.HZ. 0566 and submit to the <br />next Hazardous Materials and Waste Workgroup meeting for review. <br />3.2.9. The EVS Supervisor or Manager will complete a Responsible <br />Reporting Form (RRF) with details of the spill. This report will be <br />completed within 24 hours and submitted to Risk Management. <br />3.2.10. The EVS Supervisor or Manager will ensure annual spill response <br />training consisting of written and hands on portion, occurs for all staff <br />members. <br />3.2.11. Department is responsible for maintaining all training documentation <br />and must have it available for any survey or regulatory agency that <br />requests it. <br />3.3. Operator Services Department Responsibilities <br />3.3.1. Upon notification of a spill obtain the following information from the <br />caller: <br />• Name <br />• Extension <br />• Department <br />• Location of Spill <br />3.3.2. Notify EVS, including Lead Aide, Supervisor or Manager if spill occurred <br />inside the building. <br />3.3.3. Notify Engineering or Gardeners for spills occurring outside the building. <br />3.3.4. Notify EH&S. <br />3.4. Plant Operations, Landscaping and Capital Projects Facilities Construction <br />Department: <br />3.4.1. Will be responsible to clean small spills in their department and on the <br />facility grounds. <br />3.4.2. Report all spills to the Chief Engineer, Support Service Leader or <br />Designee. This notified person will then notify the EH&S Department. <br />3.4.3. Staff will be trained on the concept of SIN (Safety, Isolate, and Notify). <br />EC.HZ.056 - Spill Management- Hazardous Materials/WastePage 3 of 6 <br />Version update: 11/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.