Laserfiche WebLink
8/30/62 <br /> 4. Contractor shall build and maintain all necessary <br /> trash fences to prevent paper, rubbish and other refuse from <br /> being blown off the Site. <br /> 5. Contractor shall supervise the dumping of all <br /> refuse and garbage upon the Site and designate the areas of <br /> dumping. <br /> 6. Contractor shall pay for all gas, water, electricity <br /> and other public utilities which may be needed for the operation <br /> of the garbage and refuse disposal facility upon the Site. <br /> 7. Contractor shall provide unloading facilities with <br /> capacity sufficient to permit the dumping of garbage and garden <br /> refuse by not less than eight (8) trucks at one time. <br /> In addition to the above, Contractor shall provide <br /> unloading facilities for at least six (6) cars to be used by <br /> members of the public. Said public unloading area shall be <br /> separated from the garbage and garden refuse unloading facilities. <br /> 8. Contractor shall operate the garbage and refuse <br /> disposal facility seven (7) days per week as follows.- <br /> (a) The City, scavengers, scavenger companies, <br /> and other persons engaged in the business of collecting refuse <br /> and garbage shall be permitted to dispose of garbage and refuse <br /> on Monday through Saturday, inclusive, between the hour of 6:00 <br /> o1clock a.m. and the hour of 5:00 o'clock p.m. <br /> (b) Members of the public desiring to dispose <br /> of garbage and refuse shall be permitted to dispose of the same <br /> daily on Monday through Sunday, inclusive, between thehourof <br /> 8:00 o'clock a.m. and the hour of 5:00 o'clock p.m. <br /> (c) The garbage and refuse disposal facility <br /> mpy be pon-operating and closed for business on all holidays <br /> observed by the duly authorized City Collector. <br /> -3- <br />