Laserfiche WebLink
TABLE 5.1: SUMMARY OF IMPACTS AND MITIGATION MEASURES (Continued) <br /> Environmental Imp= Mitigation Measure Level of Significance After Miti ag tion <br /> E. Cultural Resources(Cont.) <br /> (c) If prehistoric archaeological deposits that include <br /> human remains are discovered by the project <br /> sponsor or any construction contractors during <br /> development of the project corridor,the project <br /> sponsor should notify the County Coroner <br /> immediately. If the remains are found to be <br /> Native American,the Native American Heritage <br /> Commission must be notified within 24 hours. <br /> (d) If avoidance of important prehistoric <br /> archaeological resources would not be feasible, <br /> the project sponsor should prepare an excavation <br /> plan in coordination with a qualified <br /> archaeologist or cultural resources consultant. <br /> F. Vegetation and Wildlife <br /> F.1. Implementation of the proposed project would (a) As avoidance of this waterway is not a viable or Less than Significant <br /> fill and relocate approximately 4.5 acres of the biologically desirable mitigation strategy due to <br /> North Fork of the South Branch of Little Johns possible surface water contamination from the <br /> Creek. (SIGNIFICANT) expanded landfill,the project sponsor shall <br /> replace the 4.5 acres of Little Johns Creek <br /> through(1)realigning the Creek as depicted in <br /> project plans to provide approximately 7.0 acres <br /> of watercourse and(2)constructing an <br /> approximately 4.3 acre detention basin as <br /> depicted on project plans(R.W. Beck and <br /> Associates, 1992). <br /> S.14 <br /> oft No iow <br />