My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in contrV <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />34 46 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />8-5-03 <br />Tuesda <br />General Contractor <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Warm 880 <br />Frank Dell -Era <br />Equipment uttuzed: <br />D5CXL Cat Dozer, Case Tractor with laser scraper box, Water Truck, Bomag Smooth Drum roller, Cleveland J57 Trencher, John <br />Deere 210LE skip loader, 310SE John Deere Backhoe, 140 cat grader, 853H Bobcat. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 13 Man crew Krazan: 3 Man Crew Industrial Fence: 2 Man crew <br />Wood Bros. moisture conditioned and compacted the foundation layer material in the northern toe soil gas <br />trench the water truck, grader and the Bomag compactor. Wood Bros. utilized the water truck and D5CXL <br />dozer to moisture condition, rip, track walk and process the subgrade material on the eastern slope. Wood <br />Bros. continued to excavate the soil gas system trenches along the eastern and western toe of slope and <br />started the anchor trench on the north west corner of Module 1 utilizing Valley Trenching J57 trencher. <br />Wood Bros. continued to place geotextile, weld and place the 4" slotted pipe with 2-3" of pea gravel under <br />the pipe then backfilled to within 1' of the finish grade utilizing the skip loader and the backhoe in the <br />eastern and western soil gas trenches. Wood Bros. had 4 loads of 3/8" pea gravel from Granites Tracy plant <br />delivered to the site. Wood Bros. utilized the Case tractor to remove sandy material from the southern slope <br />and replace with some clayey silt material from the borrow area and to cut the foundation layer to finish <br />grade. Wood Bros. excavated the 2nd V ditch off the north toe of slope a minimum of 2'. <br />Industrial fence continued to excavate fencepost holes down to a depth of 3' utilizing the Bobcat with auger. <br />Krazan started placing the grout for the soil gas wells. Krazan installed Lysimeters LZ#3 and half of LZ#2 <br />due to 1 of the bored holes had some spoils fall into it. Krazan will bring a hand auger tomorrow to clean the <br />hole. Ted Tasiopoulos from Enviromental health was on site today. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the foundation <br />layer material placed in the soil gas trenches and the V ditches. CQA performed several density tests with all <br />tests meeting the required specifications. CQA observed pipe welding, geotextile placement and backfill of <br />the soil gas system with 3/8" pea gravel. CQA observed installation of lysimeter LZ#3 and portions of LZ#2. <br />Vector discussed with Wood bros. will continue placement of gravel, welding of pipe and excavation of the soil gas trenches. ME will start liner <br />installation on Thursday. <br />C: <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By:01 A <br />
The URL can be used to link to this page
Your browser does not support the video tag.