C <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 35 45 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />8-6-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Warm 890 <br />[Frank Dell -Era <br />Equipment Utilized: <br />D5CXL Cat Dozer, Case Tractor with laser scraper box, Water Truck, Bomag Smooth Dntm roller, Cleveland J57 Trencher, John <br />Deere 21OLE skip loader, 31OSE John Deere Backhoe, 140 cat grader, 853H Bobcat. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew Krazan: 2 Man Crew Industrial Fence: 2 Man crew <br />Wood Bros. moisture conditioned and compacted foundation layer material in the 2nd V ditch off the <br />northern slope utilizing the grader, water truck and smooth drum roller. Wood Bros utilized the D5CXL, <br />water truck and smooth drum roller to compact subgrade material on the eastern slope. Wood Bros. <br />continued to smooth drum roil the northern portion of the floor. Wood Bros. continued to excavate the soil <br />gas system trenches along the southern toe and the anchor trench on the northern and eastern top of slope <br />utilizing Valley Trenching JS57 trencher. Wood Bros. continued to place geotextile, weld and place the 4" <br />pipe with 2-3" of pea gravel under the pipe then backfilled to within 1' of the finish grade utilizing <br />,slotted <br />the skip loader and the backhoe in the western and southern soil gas trench. Wood Bros. utilized the Case <br />tractor with laser set-up to finish grade the floor in Module 1. <br />Industrial fence augured fence postholes utilizing the Bobcat with auger. <br />Krazan completed placement of grout for the soil gas wells. Krazan completed installation of Lysimeter <br />LZ#2. Krazan will be back at a later date to install the cans and concrete. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the foundation <br />layer and subgrade material placed in the V ditch and the east slope. CQA performed several density tests <br />with all tests meeting the required specifications. CQA observed pipe welding, geotextile placement and <br />backfill of the soil gas system with 3/8" pea gravel <br />Vector discussed with Wood bros. will continue placement of gravel, welding of pipe and excavation of the soil gas trenches. Wood bros. will <br />MC% and compact the eastern slope. <br />C <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />