My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager. Daily Field Report Sequence Number Days left in contra <br />County of San Joaquin 48 <br />32 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />8-25-03 <br />Monday <br />General Contractor <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Tony Peichoto / Mario Garza <br />Eric Downs/ Victor Cassillas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brownsandy silt <br />Clear 1010 <br />Frank Dell -Era / Harry Munster <br />"yurpurcur Uuuccu: <br />Water Truck, 140 cat grader, TH83 Cat Forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 4 Man crew D&E: 1 Man crew <br />Wood Bros. has the grader and water truck moisture condition soil for construction of an access ramp. Wood <br />Bros. placed plywood at the access ramp crossing of the anchor trench and placed soils for the access ramp. <br />Wood Bros. placed 8 ounce geotextile cushion under the 4" slotted pipe down the northern V ditch and <br />started welding pipe with SS wire cable through it. <br />D&E: D&E unloaded 2 load of GCL (Bentofix NWL) totaling approximately 74448.36ft2. D&E did not <br />deploy liner materials today. <br />Vector Engineering, Inc. CQA observed unloading and logged GCL rolls delivered to the site. CQA <br />reviewed quality control certs on the NWL 35 delivered to the site. CQA observed welding of LCRS pipe, <br />placement of geotextile, plywood and soil in anchor trench for access ramp. CQA pulled 2 samples for sieve <br />analysis and plasticity Index testing of proposed operations material. CQA pulled sieve analysis samples and <br />shipped 2 buckets of LCRS proposed drainage aggregate to Vector Engineering for testing. <br />Vector discussed with Wood bros. D&E will lay geocomposite today at North County today and liner at Foothill this afternoon. Wood bros will <br />start placement of the drainage aggregate tomorrow morning. <br />Jile Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed Bv: <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.