Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />49 31 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />8-26-03 <br />Tuesday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs/ <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt ]_Cloudy <br />880 Rain y a.m. <br />Frank Dell -Era / Harry Munster <br />C....:.....e... 1 f.A:..,.,1. <br />.-y...1...wua vuucwa. I <br />Water Truck, D5CXL Cat Dozer, 140 cat grader, TH83 Cat Forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 5 Man crew D&E: 12 Man crew <br />Wood Bros. had 15 transfer trucks hauling import 3/8" drainage aggregate from Granites Tracy plant to the <br />site today. Wood Bros built a ramp down the western slope utilizing the drainage aggregate spread out by a <br />D5CXL dozer about 2' thick. Wood Bros continued to weld the LCRS 4" slotted pipe today. <br />D&E: D&E unloaded 1 load of 60mil geomembrane material totaling approximately 128,700ft2 and 4 loads <br />of GCL (Bentofix NWL) totaling approximately 148,896.72ft2. D&E held off on deployment at Foothill in <br />the early morning due to rain. D&E continued installation of GCL rolls with a minimum of 351bs peel and <br />60mil double textured liner. D&E continued to deploy on the Northern slope and floor of Module 1. D&E <br />*installed a total of 25 panels of GCL totaling approximately 35,540ft2 and 8 panels of geomembrane totaling <br />approximately 15,180ft2 all panels were overlapped and seamed per specifications. No repairs or air tests <br />were performed. D&E placed sandbags as ballast on the liner edges prior to leaving the site. <br />Vector Engineering, Inc. CQA observed placement and pulled sieve analysis of the LCRS drainage <br />aggregate being delivered today. CQA observed unloading and logged GCL rolls delivered to the site. CQA <br />observed and logged subgrade acceptance, panel deployment, seaming performed on the liner materials. <br />CQA marked destructive samples. CQA performed 5 sieve analyses on the LCRS gravel. <br />Vector discussed with Wood bros., D&E will not deploy this morning due to rain at Foothill, but will go to North County. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />