Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />85 -5 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-16-03 <br />Thursda <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 900 <br />Frank Dell -Era / Nathan DeWitt <br />Y Y w. <br />Water Truck, 2-D6LGP Cat Dozers, DSCXL Cat dozer, 2-623 Cat Paddle wheel scrapers, 227 Cat Track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew <br />Wood Bros. continued to import drainage aggregate material from Granites Tracy plant utilizing 24 transfer <br />and end dump trucks. Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing <br />the D6LGP with a laser set-up and a laborer watching for wrinkles. Wood Bros continued placement of <br />operations material on the floor of Module 1 utilizing two 623 paddle wheel scrapers and a D6LGP with a <br />laborer to spread the material. Wood Bros utilized the D5CXL to rip and process the operations material in <br />stockpile A. Wood Bros. continued to weld the 4" pipe for the southern V ditch. <br />4OVector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate imported <br />and operations layer material from stockpile A. CQA observed placement of geotextile placed in the <br />southern most V ditch. CQA performed 2 washes on the operations material. <br />Vector discussed with Wood Bros. need to watch pulling sandbags out of V ditch prematurely. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />