Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />86 -6 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-17-03 <br />Friday <br />General Contractor. <br />Liner Contractor <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 880 <br />Frank Dell -Era / Nathan DeWitt <br />i 4_F111c1Jt vuuaw. I <br />2 -Water Trucks, 2-D6LGP Cat Dozers, D5CXL Cat dozer, 2-623 Cat Paddle wheel scrapers, Cat Track forklift 227. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 11 Man crew D&E: 7 Man crew <br />Wood Bros. continued to import drainage aggregate material from Granites Tracy plant utilizing 24 transfer <br />and end dump trucks. Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing <br />the D6LGP with a laser set-up and a laborer watching for wrinkles. Wood Bros continued placement of <br />operations material on the floor of Module 1 utilizing two 623 paddle wheel scrapers and a D6LGP with a <br />laborer to spread the material. Wood Bros utilized the D5CXL to rip and process the operations material in <br />stockpile A. Wood Bros brought in another 623 paddle wheel scraper. <br />Surveyors Group Inc, on site verifying thickness of the drainage aggregate material on the eastern and <br />southern floor of Module 1. 0 <br />D&E installed approximately 300,000ft2 of geotextile filter fabric on the eastern and southern portions of the <br />floor. All seams were overlapped 6" and sewn. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile A. CQA performed 2 sieve analysis on the operations material. CQA <br />observed placement and seaming of geotextile filter installed. CQA informed Wood bros that some material <br />stockpiled will need to be removed. Mark will get with CQA on Monday and have his scrapers remove the <br />material. <br />Vector discussed with Wood Bros. some unsuitable material was stockpiled in the early morning and will need to be removed. Mark will talk to <br />his crew and stay away from questionable areas in the stockpile until it can be cleared. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />