Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />100 -20 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-6-03 <br />Thursday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician. <br />Brown sandy silt <br />Clear 65 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment Utilized: <br />2 -Water Trucks, 2-D6LGP Cat Dozers, 3-623 Cat Paddle wheel scrapers, TH 227 Cat forklift, Scat Cat 1500C forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 18 Man crew D&E: 7 Man crew <br />Wood Bros. completed import and grading of the drainage aggregate materials from Granites Tracy Plant. <br />Wood Bros. continued placement of operations material on the floor and the eastern slope of Module 1 <br />utilizing 3- 623 paddle wheel scrapers and a D6 dozer with a laborer to spread the material. Wood brothers <br />continued to compact the anchor trench on the western, southern and eastern slopes. <br />D&E installed and seamed geocomposite on the western, southern and eastern slopes. D&E deployed a total <br />of approximately 36,311.5ft2 of geocomposite. D&E installed and seamed approximately 4,388.5ft2 of <br />geotextile on the eastern floor of Module 1. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed placement and <br />grading of the LCRS drainage aggregate and operations layer material from stockpile 2. CQA observed <br />deployment and seaming of geocomposite and geotextile materials deployed. CQA performed density tests <br />on the compacted anchor trench with tests meeting the requirements for this project. Wood Bros hit the <br />geotextile filter fabric along the southern toe. CQA observed cleaning of the textile and drainage aggregate <br />down to the liner for inspection. While on a walk through CQA found an area that had some water under the <br />liner system. CQA notified Wood Bros, D&E and the project engineer whom notified the County of San <br />Joaquin. Wood Bros will open it tomorrow if it is not raining. <br />Vector discussed with Wood Bros CQA needs to walk the sump liner prior to installation of the cushion geotextile. Due to pending rain Wood <br />Bros will need to grade the roads and drainage ditches to avoid water from ponding. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />