Laserfiche WebLink
�1 <br />L <br />Vector Engineering <br />Daily Field Report <br />Job Number: 0312-3901 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill <br />County of San Joaquin <br />3 77 <br />Modules- Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-20-03 <br />Friday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Piechoto <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Warm 860 <br />Frank Dell -Era / Jeremy Freas <br />1:1 <br />Equipment Utilized: <br />2-631C Cat Scraper, 140H CatGrader, D9G Dozer, 825 Sheepsfoot Cat compactor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew <br />Wood Bros.had 2- 631 scraper excavating out 6" to a 1' of foundation layer material to process and construct <br />test pad on the west and southern floor of module 1. Wood Bros utilized the compactor and grader to break <br />the material up then moisture conditioned the material and compacted back in place utilizing the scraper to <br />wheel roll and the 825 to compactor. Wood Brothers continued to excavate unsuitable materials from <br />Module 1 and haul to the stockpile west of Module 1 for the site daily cover material as directed by Jesse <br />Padilla. Brazil Water maintained moisture in test pad areas and access roads. <br />Vector Engineering, Inc. CQA observed construction of test pads to verify foundation layer material meets <br />conformance specifications. CQA calculated 2 proctor curves, 2 PI's and 2 4200 washes performed on the <br />test pads in Module 1. CQA pulled samples on materials Wood Bros had processed today samples FL#4- <br />FL#5 for sieves, proctors and PI's. <br />Vector discussed with Wood bros. Wood Bros expects to start processing and compacting foundation layer material on Monday. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />