Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in contra <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 4 76 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-23-03 <br />Monday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other <br />Tony Piechoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Wind 1, 80° <br />Frank Dell -Era / Jeremy Freas <br />equipment untuzea: - <br />2-631C Cat Scraper, 140H CatGrader, D9G Dozer, 825 Sheepsfoot Cat compactor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew Surveyors group Inc: 2 Man crew <br />Wood Bros.had 2- 631 scraper excavating 1' of foundation layer material from the northern floor area to the <br />middle of the floor for processing. Wood Bros let the soil dry back then utilized the 825 sheepsfoot <br />compactor and scrapers to break the material up. Wood Brothers continued to excavate unsuitable materials <br />from Module 1 and haul to the stockpile west of Module 1. Wood Bros. checked depth of excavation <br />utilizing a laser set off a hub on the floor in Module 1. Brazil Water maintained moisture in test pad areas <br />and access roads. Wood Brothers brought in a D6 Cat with a disc. <br />Surveyors group Inc, set grade staking on a 100' grid system on the floor of Module 1. <br />Vector Engineering, Inc. CQA observed excavation of unsuitable materials from the floor of Module 1. CQA <br />observed surveying of the floor in Module 1, checking of excavated depth utilizing a laser set-up. CQA <br />observed processing of proposed foundation layer material, CQA pulled evaluation / conformance samples. <br />CQA pulled a proctor curve, PI's and #200 wash from the processed area of proposed foundation material. <br />CQA performed 3- #200 washes, set-up 2 PI's, ran 2 proctors and started to set another proctor up for <br />testing. <br />Vector discussed with Wood bros. Only excavation and processing today of the foundation layer material will occur today. CQA discussed that <br />the survey was to take place set on a 50' grid not 100'. Tony said it will but staking will be at a 100' grid system. <br />0 <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />