Laserfiche WebLink
NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew Surveyors group Inc: 2 Man crew <br />Wood Bros. continues to utilize 3- 631 scrapers to excavate 1' of foundation layer material for processing <br />about 250' off the north toe of slope in the middle of Module 1. Wood Bros continues to dry back the soil <br />then utilizes the 825 sheepsfoot compactor and scrapers to break the material up. Wood Brothers continued <br />to excavate unsuitable materials from Module 1 and haul to the stockpile west of Module 1. Wood Bros. <br />continues to check depth of excavation of the foundation layer utilizing a laser set -up on the floor. Brazil <br />Water maintained moisture in test pad areas and access roads. Wood Bros started ripping the southern slope <br />utilizing the D6. Wood Bros started clearing and grubbing the eastern slope utilizing the grader. <br />Surveyors group Inc, completed the 100' grid system on the floor of Module 1, set staking for LZ#1-LZ#4 <br />and set 20' off set staking for the hinge point around Module 1. <br />Vector Engineering, Inc. CQA observed excavation of unsuitable materials from the floor of Module 1. CQA <br />observed surveying of the floor in Module 1, checking of excavated depth utilizing a laser set-up. CQA <br />observed processing of proposed foundation layer material, CQA pulled evaluation / conformance samples. <br />CQA pulled a proctor curve, PI's and #200 wash from the processed area of proposed foundation material. <br />n <br />Vector discussed with Wood bros. will continue to excavate and process the foundation layer material today. County of San Joaquin wants CQA <br />to check location of the SG wells to see if located close to planned area. <br />File Name: Foothill Landfill Prepared Bv: Frank Dell -Era Reviewed <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />5 75 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-24-03 <br />Tuesda <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />I Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Piechoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Hot 940 <br />Frank Dell-Era / Jeremy Freas <br />Equipment Utilized: <br />2-631C Cat Scraper, 140H CatGrader, D9G Dozer, D6 Cat Dozer with Disc, 825 Sheepsfoot Cat compactor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew Surveyors group Inc: 2 Man crew <br />Wood Bros. continues to utilize 3- 631 scrapers to excavate 1' of foundation layer material for processing <br />about 250' off the north toe of slope in the middle of Module 1. Wood Bros continues to dry back the soil <br />then utilizes the 825 sheepsfoot compactor and scrapers to break the material up. Wood Brothers continued <br />to excavate unsuitable materials from Module 1 and haul to the stockpile west of Module 1. Wood Bros. <br />continues to check depth of excavation of the foundation layer utilizing a laser set -up on the floor. Brazil <br />Water maintained moisture in test pad areas and access roads. Wood Bros started ripping the southern slope <br />utilizing the D6. Wood Bros started clearing and grubbing the eastern slope utilizing the grader. <br />Surveyors group Inc, completed the 100' grid system on the floor of Module 1, set staking for LZ#1-LZ#4 <br />and set 20' off set staking for the hinge point around Module 1. <br />Vector Engineering, Inc. CQA observed excavation of unsuitable materials from the floor of Module 1. CQA <br />observed surveying of the floor in Module 1, checking of excavated depth utilizing a laser set-up. CQA <br />observed processing of proposed foundation layer material, CQA pulled evaluation / conformance samples. <br />CQA pulled a proctor curve, PI's and #200 wash from the processed area of proposed foundation material. <br />n <br />Vector discussed with Wood bros. will continue to excavate and process the foundation layer material today. County of San Joaquin wants CQA <br />to check location of the SG wells to see if located close to planned area. <br />File Name: Foothill Landfill Prepared Bv: Frank Dell -Era Reviewed <br />