Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number Days left in contra <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />6 74 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-25-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Piechoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear 980 <br />Frank Dell -Era / JeremyFreas <br />Equipment Utilized: <br />2-631C Cat Scraper, 140H CatGrader, D9G Dozer, D6 Cat Dozer with Disc, 825 Sheepsfoot Cat compactor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew Surveyors group Inc.: 2 Man crew <br />Wood Bros. completed excavation of the north floor utilizing 2- 631 scrapers with the D9 push cat, Wood <br />Bros. hauled the material to the middle of the floor for processing. Wood Bros. continued to break the <br />material up utilizing the 825 sheepsfoot. Wood Brothers continued to excavate unsuitable materials from <br />Module 1 and haul to the stockpile west of Module 1. Wood Bros. continued to check depth of excavation <br />utilizing a laser set-up. Wood Bros. ripped the southern and northern slope utilizing the D6 dozer. Wood <br />bros. utilized the 825 to compact the foundation layer subgrade prior to placement of the 1St lift. Brazil Water <br />maintained moisture in test pad areas and access roads. <br />Surveyors group Inc. completed setting the 20' off set staking of Module 1. <br />Vector Engineering, Inc. CQA observed excavation of unsuitable materials from the floor of Module 1. CQA <br />observed checking of excavated depth utilizing a laser set-up. CQA observed processing and placement of <br />proposed foundation layer material, CQA pulled evaluation / conformance samples. CQA pulled a proctor <br />curve, PI's and #200 wash from the processed area of proposed foundation material. CQA performed 14200 <br />wash, ran a PI and set-up another PI, ran 1 proctors and set-up 2 more proctor's up for testing. <br />Vector discussed with Wood bros. will continue excavation of the northern floor and start placement this afternoon. <br />C <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />