Laserfiche WebLink
n <br />u <br />Vector Engineering <br />Daily Field Report <br />Job Numbers 031602.00 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />7 73 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-26-03 <br />Thursday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Piechoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />1010 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631C Cat Scraper, D9G Dozer, D6 Cat Dozer with Disc, 825 Sheepsfoot Cat compactor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew <br />Wood Bros. continued to excavate and process foundation layer material. Wood Bros. continued to check <br />depth of the excavation utilizing a laser. Wood Brothers completed placement of the 1St lift on the northern <br />portion of the floor but did not compact due to lack of substantial water availability. Wood Brothers <br />continued to excavate unsuitable materials from Module 1 and haul to the stockpile west of Module 1. Wood <br />Bros continued to clear and grub the slopes utilizing the D6 dozer. Brazil Water maintained moisture on <br />access roads and foundation layer material placed today <br />Vector Engineering, Inc. CQA attended the weekly construction meeting at North County Landfill. CQA <br />19observed excavation of unsuitable materials from the floor of Module 1. CQA observed checking of <br />excavated depth utilizing a laser set-up. CQA observed processing of proposed foundation layer material, <br />CQA pulled evaluation / conformance samples. CQA pulled 3 -washes a proctor curve and PI. CQA <br />performed 1- #200 washes, set-up 2 PI's, ran 2 proctors and set another proctor up for testing. <br />Vector discussed with Wood bros. Compaction will take place today if they can maintain moisture in the foundation layer material. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />