Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />17 63 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-11-03 <br />Frida <br />General Contractor <br />Liner Contractor. <br />Project Engineer <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Wann 1040 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631 C Cat Scra er, D9G Dozer, D6 Cat Dozer with disc, D5CXL Cat Dozer, 825 Shee sfoot Cat com actor, 2 -Water Trucks. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 8 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the northern <br />portion of Module 1. Wood Bros. hauled material from the processing pad to the 4th bay off the northern <br />slope for the 1St lift and to the P bay northwest corner for the 2nd lift utilizing the D9 dozer and 2-631 <br />scrapers. Wood brothers continued to utilize 2- water trucks and the D6 with disc to moisture condition the <br />foundation layer material prior to compaction. Wood Bros. continued to check grade on each lifts thickness <br />utilizing a laser set-up. Wood bros. utilized the 825 to compact the lower portion with the scrapers wheel <br />rolling the surface. Wood Bros. had the D5CXL dozer clearing some grass off the slopes. Wood Bros utilized <br />the 825 to process the soils material on the north slope. <br />*Vector Engineering, Inc. CQA observed placement and tested compaction of foundation layer material <br />placed on the northern floor of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications for this project. CQA performed a sieve analysis, Plasticity index and moisture <br />density relationship curve on foundation layer material. <br />Vector discussed with Wood bros. Krazan will be on site Monday to start installation of the Lysimeters and soil gas wells. <br />0 <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />