Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: Client Or Manager. Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- County of San Joaquin 18 62 <br />Foothill Landfill <br />Location of Work: Owner's Or Client's Representative Date: Day of The Week: 7 <br />Stockton Ca. Mike Carroll 7-14-03 on ay <br />General Contractor. Liner Contractor. Project Engineer: Reviewed By: <br />Wood Brothers D&E Construction Bryan Fritzler <br />General Foreman: Liner Superintendent: Other. <br />Tony Peichoto / Mario Garza Eric Downs <br />Source and Description of Fill Material: Weather. CQA Technician: <br />On site tan Brown sandy silt Clear Warm 960 Frank Dell -Era / Jeremv Freas <br />Equipment Utilized: <br />2-631C Cat Scraper, D9G Dozer, D6 Cat Dozer with disc, D5CXL Cat Dozer, Case Tractor with laser scraper box, 825 Sheepsfoot <br />Cat compactor, 2 -Water Trucks. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 10 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the northern <br />portion of Module 1. Wood Bros. hauled material from the processing pad to the 5th bay off the northern <br />slope for the 1St lift and to the northwest corner for the 2nd lift utilizing the D9 dozer and 2-631 scrapers. <br />Wood brothers continued to utilize 2- water trucks and the D6 with disc to moisture condition the foundation <br />layer material prior to compaction. Wood Bros. brought in a Tractor with a laser scraper box to control <br />grades and lift thickness. Wood bros. continued to utilize the 825 to compact the lower portion with the <br />scraper wheel rolling the surface. Wood bros. had the D5CXL dozer ripping and the 825 compactor <br />processing the soil material on the slopes. Wood Bros. unloaded 1 load with 14 rolls of 8 -ounce geotextile <br />material for the soil gas system. <br />D&E had a Cat TH83 forklift delivered to the site today for off loading liner materials. <br />Vector Engineering, Inc. CQA observed placement and tested compaction of foundation layer material <br />placed on the northern floor of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications for this project. CQA set-up a sieve analysis and moisture density relationship curve <br />on foundation layer material. <br />Vector discussed with Wood bros. CQA was unaware of the geotextile being delivered to the site today. CQA will call and find out if it is <br />approved for installation. Mike Carroll will check with Fred Cope at Emcon if submittal is o.k. Mike Carroll e-mailed an acceptance for the <br />geotextile delivered to the site for the soil gas collection trenches only. <br />9 <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />