My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: Client Or Manager. Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- County of San Joaquin 18 62 <br />Foothill Landfill <br />Location of Work: Owner's Or Client's Representative Date: Day of The Week: 7 <br />Stockton Ca. Mike Carroll 7-14-03 on ay <br />General Contractor. Liner Contractor. Project Engineer: Reviewed By: <br />Wood Brothers D&E Construction Bryan Fritzler <br />General Foreman: Liner Superintendent: Other. <br />Tony Peichoto / Mario Garza Eric Downs <br />Source and Description of Fill Material: Weather. CQA Technician: <br />On site tan Brown sandy silt Clear Warm 960 Frank Dell -Era / Jeremv Freas <br />Equipment Utilized: <br />2-631C Cat Scraper, D9G Dozer, D6 Cat Dozer with disc, D5CXL Cat Dozer, Case Tractor with laser scraper box, 825 Sheepsfoot <br />Cat compactor, 2 -Water Trucks. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 10 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the northern <br />portion of Module 1. Wood Bros. hauled material from the processing pad to the 5th bay off the northern <br />slope for the 1St lift and to the northwest corner for the 2nd lift utilizing the D9 dozer and 2-631 scrapers. <br />Wood brothers continued to utilize 2- water trucks and the D6 with disc to moisture condition the foundation <br />layer material prior to compaction. Wood Bros. brought in a Tractor with a laser scraper box to control <br />grades and lift thickness. Wood bros. continued to utilize the 825 to compact the lower portion with the <br />scraper wheel rolling the surface. Wood bros. had the D5CXL dozer ripping and the 825 compactor <br />processing the soil material on the slopes. Wood Bros. unloaded 1 load with 14 rolls of 8 -ounce geotextile <br />material for the soil gas system. <br />D&E had a Cat TH83 forklift delivered to the site today for off loading liner materials. <br />Vector Engineering, Inc. CQA observed placement and tested compaction of foundation layer material <br />placed on the northern floor of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications for this project. CQA set-up a sieve analysis and moisture density relationship curve <br />on foundation layer material. <br />Vector discussed with Wood bros. CQA was unaware of the geotextile being delivered to the site today. CQA will call and find out if it is <br />approved for installation. Mike Carroll will check with Fred Cope at Emcon if submittal is o.k. Mike Carroll e-mailed an acceptance for the <br />geotextile delivered to the site for the soil gas collection trenches only. <br />9 <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.