Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 19 61 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: ­71T <br />ay of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-15-03 <br />Tuesda <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Warm 990 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631 C Cat Scraper, D9G Dozer, D6 Cat Dozer with disc, D5CXL Cat Dozer, Case Tractor with laser scraper box, 825 Sheepsfoot <br />Cat compactor, 2 -Water Trucks. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 11 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the northern <br />portion of Module 1. Wood Bros. hauled material from the processing pad to the 4th bay off the northern <br />slope for the 1St lift utilizing the D9 dozer and 2-631 scrapers. Wood brothers continued to utilize 2- water <br />trucks, the D6 with disc and the tractor with scraper box to moisture condition the foundation layer material <br />prior to compaction. Wood bros. continued to utilize the 825 to compact the lower portion with the scrapers <br />wheel rolling the surface. Wood bros. had the D5CXL dozer, 825 compactor and a water truck moisture <br />conditioning and processing the soil material on the slopes. Krazan's Drill rig arrived on site late afternoon <br />and will start drilling the soil gas wells tomorrow morning. <br />*Vector Engineering, Inc. CQA observed placement and tested compaction of foundation layer material <br />placed on the northern floor of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications for this project. CQA performed a sieve analysis and moisture density relationship <br />curve on foundation layer material. CQA set-up a sieve analysis, wash and a moisture density curve on the <br />foundation layer material. Mike Carroll on site. <br />Vector discussed with Wood bros. 2 scrapers are broke down this morning. Wood Bros. Mechanic on site at 7:30.2"d scraper running at 8:40. A <br />3rd water Truck will be brought in tomorrow. Liner should start arriving on site tomorrow. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />