Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: Client Or Manager. Daily Field Report Sequence Number. Days left in contra <br />Construction of 2 Landfill Modules- County of San Joaquin 20 60 <br />Foothill Landfill <br />Location of Work: Owner's Or Client's Representative Date: Day of The Week: <br />Stockton Ca. Mike Carroll 7-16-03 Wednesday <br />General Contractor. Liner Contractor Project Engineer. Reviewed By: <br />Wood Brothers D&E Construction Bryan Fritzler <br />General Foreman: Liner Superintendent: Other - <br />Tony <br />therTon Peichoto / Mario Garza Eric Downs <br />Source and Description of Fill Material: Weather. CQA Technician: <br />On site tan Brown sandy silt Clear Warm 980 Frank Dell -Era / Jeremv Freas <br />Equipment Utilized: <br />2-631 C Cat Scraper, D9G Dozer, D6 Cat Dozer with disc, D5CXL Cat Dozer, Case Tractor with laser scraper box, 825 Sheepsfoot <br />Cat compactor, 3 -Water Trucks, Drill Rig, 140 Cat Grader.. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: I I Man crew Krazan/Soil Probe: 3 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the northern <br />and Middle portion of Module 1. Wood Bros. hauled material from soil borrow area A to the 4th and 5th bays <br />off the northern slope for the 1St lift utilizing the D9 dozer and 2-631 scrapers. Wood brothers continued to <br />utilize 2- water trucks, the D6 with disc and the tractor with scraper box to moisture condition the foundation <br />layer material prior to compaction. Wood bros. continued to utilize the 825 to compact the lower portion <br />with the scrapers wheel rolling the surface. Wood bros. had the D5CXL dozer, 825 compactor and a water <br />truck moisture conditioning and processing the soil material on the slopes. Wood Bros. Grader on site <br />grading haul roads. Wood Bros. cut a haul road down the southern slope to shorten the haul from the soil <br />borrow area A. 0 <br />Krazan/soil Probe drilled wells #946 and started well #10. Krazan only drilled no placement of probes or <br />backfill occurred. Mark Edwards turned in drill logs to CQA. <br />Vector Engineering, Inc. CQA observed placement and tested compaction of foundation layer material <br />placed on the northern floor of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications for this project. CQA performed a sieve analysis, 2 washes and a moisture density <br />relationship curve on foundation layer material. CQA set-up a Plasticity index. <br />Vector discussed with Wood bros. will need to recompact where the haul road was cut on the southern slope. Krazan will drill gas wells but not <br />install anything until the county inspector is on site. <br />C <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />