Laserfiche WebLink
BACT Analysis Data for Foothill Landfill <br /> Control Device Name: LO-CAT System <br /> Control Device Description: LO-CAT for reduction of TRS as 1-12S to 10 PPMV from 150 PPM <br /> En ine Emissions SOx SOx lb/dav Sox tPy 2 Engines tpy <br /> Guaranteed Uncontrolled my 15%02 150 33.86 6.18 <br /> Est. Controlled my @ 15%02 10 2.25 0.41 <br /> Percent reduction 93% 31.62 5.77 11.54 <br /> Flare Emissions Sox SOx lb/day SOL t Flare tov <br /> Guaranteed Uncontrolled my 15%02 150 1 6.74 1 1.23 <br /> Est.Controlled my 15%02 10 0.44 0.08 <br /> Percent reduction 93% 6.30 1.15 2.30 <br /> Ca ital Cost for LO-CATS stem Percent for Cost for <br /> Description Capital Cost SOx Reduction SOx Reduction Comments <br /> LO-CATS stem $ 1,120,000 100% $ 1,120,000 SCS Estimate' <br /> Support Equipment $ 448,000 100% $ 448,000 SCS Estimate <br /> LO-CAT Installation $ 448,000 100% $ 448,000 SCS Estimate <br /> Permitting and Design $ 50,000 100% $ 50,000 SCS Estimate <br /> Sales Taxes 8.75% $ 180,775 $ 180,775 For Purchase of Major E ui menta <br /> Contingency 10% $ 224,678 $ 224,678 Based on 10%Contin enc 4 <br /> Total Capital Cost $ 2,471,453 <br /> Equivalent Annual Control Equipment Ca ital Cost* $ 402,217.51 <br /> "SJVAPCD BACT PolicySection X A 1 <br /> Annual Operating Cost(for LO-CAT System) Percent for Cost for <br /> and Estimated Overhaul/Medial Rel2lacement Cost Annual Cost SOx Reduction SOx Reduction Comments <br /> Chemical Cost $ 7,770 100% $ 7,770 SCS Estimate <br /> Dis osal Cost $ 3,306 100% $ 3,306 SCS Estimate <br /> Transportation $ 577 100% $ 577 SCS Estimate <br /> Labor $ 33,500 100% $ 33,500 SCS Estimate <br /> Maintenance $ 123,573 100% $ 123,573 SCS Estimate <br /> Power $ 26,162 100% $ 26,162 SCS Estimate' <br /> Contingency 10% $ 16,873 $ 16,873 Based on 10%contin enc 4 <br /> Total Annual Operating and Replacement Cost $ 211,760 <br /> Total Annual Cost $ 613,977.67 <br /> Cost Effectiveness of LO-CATS stem: <br /> Cost effectiveness($/ton) = Annual cost$/ ear / District Standard Emissions-Emissions(w/tech feas BACT ton/ ear <br /> Engine Cost Effectiveness $ 613,977.67 /year 11.54 ton/ ear $53,204.30 /ton <br /> SJVAPCD CO Cost Effectiveness $18,300/ton Not Cost Effective <br /> Flare Cost Effectiveness $ 613 977.67 /year 2.30 ton/ ear $266,946.81 /ton <br /> SJVAPCD CO Cost Effectiveness $18,300/ton Not Cost Effective <br />