Laserfiche WebLink
• 2006: Site Improvement Project executed, including a installing a LFG system and a gas-tight HDPE <br /> "liner" over refuse as required by District staff <br /> • July 2007: Landfill gas system operates near-continuously <br /> • September 2010 (five years after installing gas-tight liner over refuse): VOCs (below 2 ppb) detected <br /> in MW-3 <br /> Foothill Sanitary Landfill 7 Department of Public Works/Solid Waste <br /> 1 st Semester 2012 Groundwater Monitoring County of San Joaquin—July 17,2012 <br />