Laserfiche WebLink
U <br />GeoSyntec Consultants <br />Table 1-1 <br />RWQCB Partial Final Closure and Post -Closure Maintenance Plan <br />Requirements per Title 27, CCR, §21769 <br />Forward Landfill <br />:Requirements per: §21769(c)(2) <br />Location in this Report <br />Contents <br />(A) Itemized Cost Analysis <br />Section 5, Cost Estimate <br />(B) Closure Schedule <br />Section 3.3, Estimated Closure Date and Section 3.5, <br />U B Closure Schedule <br />(C) Final Treatment Procedures <br />Not Applicable <br />(D) Map <br />Figures 2-2, 2-3, and 3-1 <br />(E) Changes to Description Under §21750 <br />Section 3.4.2.3, Landfill Slope Stability and Section <br />(Re ort of Waste Discharge) <br />3.4.2.4, Final Cover Slope Stability; Figures 3-1 and 3-2. <br />(F) Changes to Description Under 21760 <br />Section 3.4.2.1, Final Cover Grading; Section 3.4.2.21, <br />(Design Report and Operations Plan) <br />Final Cover Materials; and Section 3.4.4 Drainage and <br />Erosion Control; Figures 3-1 and 3-2. <br />(G) MSW <br />Section 3, Partial Final Closure Plan; Section 4.3, Post - <br />Closure Land Uses; Section 4.9, Post -closure Care <br />Certification <br />(H) Land Use of Closed Unit <br />Sections 3.1 and 4.3, Post -Closure Land Uses <br />J:\ALLIED\FORWARD\CLOSUREPLAN\REPORT 1-4 99.11.30 <br />