My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br />evaporation pond. Leachate will continue to be pumped into the evaporation pond <br />during the post -closure period. <br />During the post -closure period for the entire Forward landfill, an automatic <br />pumping system will be installed to pump leachate directly from each permanent sump <br />to the leachate evaporation pond. The volume of recovered leachate and depth of <br />leachate in each sump riser pipe will be recorded on a quarterly basis during the <br />post -closure maintenance period. A composite sample of leachate will be collected and <br />tested from the leachate pond on a quarterly basis. Leachate will continued to be <br />pumped and monitored throughout the post -closure maintenance period until leachate is <br />no longer being produced or the leachate analysis results show that discharges of <br />leachate will have no impact on water quality, subject to regulatory approval. <br />3.4.7 Groundwater and Vadose Zone Monitoring <br />Title 27, CCR §21769(c)(2)(F)(4)a discussion, including a map, of groundwater <br />and unsaturated zone monitoring programs for the closure and post -closure <br />maintenance periods... <br />The current groundwater and vadose zone monitoring activities (see Section 2.2) <br />will continue into the 30 -year, WMU B post -closure maintenance period on a quarterly <br />basis. The monitoring well and vadose zone locations are shown on Figure 2-3. <br />3.4.8 Partial Final Closure Certification <br />Per Title 27, CCR and Subtitle D of the Code of Federal Regulations, upon the <br />completion of WMU B closure activities a Partial Final Closure CQA Report will be <br />prepared. The report will be signed by a registered civil engineer or certified <br />engineering geologist to verify that the closure activities were performed in accordance <br />with the approved closure plan for the WMU B area. <br />3.5 WMU B Closure Schedule <br />The estimated WMU B partial final closure schedule has been summarized on the <br />following project schedule. The scheduled dates are dependent on assumed future Class <br />III waste streams and the incorporation of a 5 -year waste settlement period, as discussed <br />in Section 3.3. <br />0 7:\ALLIED\FORWARD\CLOSUREPLAN\REPORT 3-15 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.