Laserfiche WebLink
LI <br />GeoSyntec Consultants <br />4.7 Monitoring Reuortin2 Requirements <br />§21830(b)(7) a summary of the requirements for reporting the results of <br />monitoring and collection, pursuant to §21180 of chapter 3, Subchapters; <br />Forward is currently following the Monitoring and Reporting Program No. 97-141 <br />per the WDR for the site (see Section 2.2). Forward will continue to follow the <br />requirements of future WDRs during the post -closure period. <br />4.8 Post -Closure Cost Estimate <br />§21830(b)(8) the post -closure maintenance cost estimates pursuant to §21840 of <br />this Subchapter; <br />The post -closure maintenance cost estimate is discussed in Section 5. <br />4.9 Post -Closure Care Certification <br />Per Title 27, CCR and Subtitle D of the Code of Federal Regulations, upon the <br />completion of the post -closure care period a registered civil engineer or certified <br />engineering geologist shall prepare a certification verifying that the post -closure care <br />activities were performed in accordance with the approved post -closure maintenance <br />plan for the WMU B area. <br />J:\ALLIED\FORWARD\CLOSUREPLAN\REPORT 4-5 99.11.30 <br />