My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU D-99 Construction September 1999 <br /> Forward Landfill Job No.986011.02 <br /> 5.3.2 GCL Conformance Testing <br /> Conformance testing of the GCL materials was performed by Vector and <br /> Precision Laboratories. Results of this conformance testing were reviewed by <br /> the Construction Manager and Vector's CQA Monitor prior to placement of the <br /> materials. Select samples of the GCL were cut in the factory and sent to the <br /> laboratory for conformance testing in accordance with the project specifications. <br /> Conformance testing included tests for mass per unit area (ASTM D-5261), swell <br /> index (ASTM D-5890), grab tensile properties (ASTM D-4632), and interface <br /> shear strength (ASTM D-5321). Results of the conformance testing performed <br /> by Vector and Precision indicated that the materials met the requirements of the <br /> project specifications. Detailed test results are provided within Appendix J <br /> (shear test results are included in Appendix G). <br /> 5.3.3 GCL Deployment <br /> Prior to installation of the GCL, the prepared subgrade was accepted by <br /> the liner installer, GSE, as required by the project specifications. GCL panel <br /> deployment in WMU -99 began on July 2, 1999 and was completed on July 20, <br /> 1999. The subgrade of the Leachate Impoundment was completed on August <br /> 13, 1999. GSE began GCL panel deployment on August 16, 1999 with <br /> completion on August 19, 1999. To protect the GCL, HDPE liner was deployed <br /> concurrently with the GCL placement. Deployment was performed in general <br /> conformance with the project specifications. <br /> 5.4 Geomembrane Installation <br /> 5.4.1 Geomembrane Factory Quality Control <br /> Upon arrival by truck shipment, the unloading and storage of the <br /> geomembrane rolls were observed by Vector's CQA Monitor. Each roll of <br /> geomembrane was logged in by roll number and the roll numbers then cross- <br /> checked against the quality control documents provided by the supplier, GSE. <br /> Information regarding the roll number, lot, batch, area, laboratory testing log, and <br /> pass/fail of the sheet was recorded. A copy of Vector's log of geomembrane <br /> Vector Engineering, Inc. - 12438 Loma Rica Dr.,#C - Grass Valley, CA - (530)272-2448 <br /> -12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.