My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU D-99 Construction September 1999 <br /> Forward Landfill Job No.986011.02 <br /> received has been included in Appendix K. The manufacturer's QC data has <br /> also been included within Appendix K. <br /> 5.4.2 Geomembrane Conformance Testing <br /> Select samples were cut from random rolls of the geomembrane for <br /> conformance testing in accordance with the project specifications and CQA <br /> manual. Conformance testing was performed by Precision. Conformance <br /> testing included tests for thickness (ASTM D-5994), specific gravity (ASTM D- <br /> 792, Method A), carbon black content (ASTM D-1603), carbon black dispersion <br /> (ASTM D-5596), and tensile properties (ASTM D-638, Type IV, NSF modified). <br /> Detailed results of the conformance tests performed for the HDPE are provided <br /> within Appendix K. The results of the conformance testing indicated that the <br /> material met the project specifications. <br /> 5.4.3 Geomembrane Deployment <br /> Panel deployment on WMU D-99 and the Eastern Ash Pit Closure began <br /> on July 2, 1999 and was completed about July 2 , 1999. Panel deployment o <br /> the Class II Leachate Impoundment began on August 16, 1999 with final <br /> completion about August 28, 1999. During the installation, Vector's CQA Monitor <br /> kept panel deployment logs. These panel deployment logs are presented within <br /> Appendix K. These logs recorded the date, time, panel number, temperature, <br /> roll number, wind, thickness of the sheet, location, and panel area. <br /> 5.4.4 Geomembrane Test Seams (Trial Start-up Welds) <br /> Prior to any seaming activities, at the beginning of each day and once <br /> during the middle of the shift, a test seam (start-up trial weld test) was prepared <br /> for each of the wedge and extrusion welders used for that shift. The seaming <br /> technicians prepared a test specimen and marked the sample with the machine <br /> number, machine temperature, date, time and their name. <br /> The shear and peel tests were performed by the installer in the field in <br /> accordance with ASTM D-4437. If the start-up weld sample failed to meet the <br /> Vector Engineering, Inc. - 12438 Loma Rica Dr.,#C - Grass Valley, CA- (530)272-2448 <br /> -13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.