Laserfiche WebLink
Stage VIII <br /> Stage VIII is a 24.1-acre area as shown on Figure 8. This area includes the entire <br /> deck and slope area of the southern most portion of the landfill. The closure <br /> volume estimates are based on a "flat deck" down to the master plan base grades. <br /> As part of this project, the area will be cleared and grubbed, as necessary, and the <br /> closure improvements constructed (e.g., final cover, permanent drainage, landfill <br /> gas system modification, etc.). <br /> 1.3 Maximum Extent of Landfill That Will Ever Require Closure <br /> The maximum extent of the landfill that will ever require closure during the life of the <br /> landfill is 217.8 187.6 acres since Stage IA partial final closure construction was <br /> completed in 2006. Table 1 (below) presents the anticipated staged closure acreages <br /> versus the liner development phases to show the maximum extent that would ever <br /> require closure. As shown, liner development Phases 1, 2 3, and 4, would be <br /> completed before the Stage I closure is implemented creating the basis for maximum <br /> extent. <br /> TABLE 1 <br /> FORWARD LANDFILL <br /> STAGED CLOSURE MATRIX <br /> DEVELOPMENT PHASE CLOSURE CLOSURE UNCAPPED AREA UNCAPPED AREA AT <br /> (LINER) LINER STAGE STAGE START OF CLOSURE STAGE <br /> PHASE AREA AREA CLOSURE STAGE COMPLETION <br /> 1,2,3,4 217.8 IA 30.2 217.8 187.66 <br /> * 2 <br /> IL 60.0 187.6 127.6 <br /> 5 13.8 II 1 5.6 141.4 135.8 <br /> 6 10.0 111 5.9 145. 139.9 <br /> 8 <br /> 7 19.3 IV 13.7 159.2 145.5 <br /> 8 19.4 V 11.8 164.9 153.1 <br /> 9 34.3 VI 20.7 187.4 166.7 <br /> Top Deck 0.0 VII 166.7 166.7 0.0 <br /> 10 24.1 VIII 24.1 24.1 0.0 <br /> * Approximately 110+ acres of Stage I are unlined. <br /> The site's closure staging was developed so as to not interfere with active disposal <br /> operations. <br /> 1.4 Closure Implementation <br /> A closure implementation schedule for the FL will be presented in each Partial Final <br /> Closure as phased closure is implemented. Closure construction will begin with <br /> mobilization of equipment and materials. The type of equipment and required <br /> personnel expected to be utilized during closure construction includes, but is not <br /> limited to, the following: <br /> 5 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Fina1CPRRevl.doc; <br /> Amendment No.3:7/3/2 ) <br />