My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:48:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Equipment <br /> — Scrapers <br /> — Dozers <br /> — Loaders <br /> — Compactors <br /> — Trucks <br /> — Soil Processing Equipment <br /> — Motor Grader <br /> — Water Truck <br /> • Personnel <br /> — Construction Manager <br /> — Field Inspector(s) <br /> — Site Engineer(s) <br /> — Geotechnical Technician(s) <br /> — Labor Crews <br /> — Equipment Operators <br /> — Surveyors <br /> — Mechanics <br /> Construction Schedule <br /> The start of partial closure construction activities for the FL partial closure and <br /> maintenance areas will commence once refuse fill elevations in that area are <br /> achieved. Table 2 presents the anticipated closure construction period for the <br /> 21:7.8187.6-acre closure area. Closure construction activities will include the <br /> following tasks: <br /> • Equipment Mobilization <br /> • Signage <br /> • Site Exploration and Survey <br /> • Structure Removal/Demolition (last phase only) <br /> • Excavation of Final Cover Soil (foundation and vegetative layers only) <br /> • Final Cover Placement (including geomembrane) <br /> • Landfill Gas System Modifications <br /> • Permanent Drainage Control Feature Installation <br /> • Drainage Control Systems Modifications <br /> • Seed and Mulch Installation <br /> • Demobilization <br /> Some of these activities will be conducted concurrently. <br /> 6 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\FinalCPRRevl.doc; <br /> Amendment No.3:7/3/2 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.