• Equipment <br /> — Scrapers <br /> — Dozers <br /> — Loaders <br /> — Compactors <br /> — Trucks <br /> — Soil Processing Equipment <br /> — Motor Grader <br /> — Water Truck <br /> • Personnel <br /> — Construction Manager <br /> — Field Inspector(s) <br /> — Site Engineer(s) <br /> — Geotechnical Technician(s) <br /> — Labor Crews <br /> — Equipment Operators <br /> — Surveyors <br /> — Mechanics <br /> Construction Schedule <br /> The start of partial closure construction activities for the FL partial closure and <br /> maintenance areas will commence once refuse fill elevations in that area are <br /> achieved. Table 2 presents the anticipated closure construction period for the <br /> 21:7.8187.6-acre closure area. Closure construction activities will include the <br /> following tasks: <br /> • Equipment Mobilization <br /> • Signage <br /> • Site Exploration and Survey <br /> • Structure Removal/Demolition (last phase only) <br /> • Excavation of Final Cover Soil (foundation and vegetative layers only) <br /> • Final Cover Placement (including geomembrane) <br /> • Landfill Gas System Modifications <br /> • Permanent Drainage Control Feature Installation <br /> • Drainage Control Systems Modifications <br /> • Seed and Mulch Installation <br /> • Demobilization <br /> Some of these activities will be conducted concurrently. <br /> 6 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\FinalCPRRevl.doc; <br /> Amendment No.3:7/3/2 ) <br />